Submissions from 2003
Transit Switch Design Analysis (Phase 1), S. P. Singh, D. D. Davis, and S. Kalay
INFLUENCE OF TRACK MAINTENANCE ON LATERAL RESISTANCE OF CONCRETE-TIE TRACK, T Sussmann, A Kish, and M Trosino
Submissions from 2002
TRANSPORTATION POLICIES IN BOGOTA, COLOMBIA: BUILDING A TRANSPORTATION SYSTEM FOR THE PEOPLE, Arturo Ardila and Gerhard Menckhoff
COMPARATIVE EVALUATION OF EXISTING AND INNOVATIVE RAIL-ROAD FREIGHT TRANSPORT TERMINALS, A Ballis and J Golias
FRACTAL ANALYSIS OF TRACK GEOMETRY DATA, J P. Hyslip
IMPROVED SPIRAL GEOMETRY FOR HIGH-SPEED RAIL AND PREDICTED VEHICLE RESPONSE, L T. Klauder, S M. CHRISMER, and J Elkins
AN EXPERIMENTAL STUDY OF THE EFFECT OF LOW-NOISE WHEELS IN REDUCING NOISE AND VIBRATION, D H. Koo, J C. Kim, W H. Yoo, and T W. Park
TOWARDS A WELFARE ENHANCING PROCESS TO MANAGE RAILWAY INFRASTRUCTURE ACCESS, J-E Nilsson
TRAM-TRAIN: NEW PUBLIC TRANSPORT SYSTEM, M NOVALES, A Orro, and M R. Bugarin
ALLOCATING TRACK MAINTENANCE COSTS ON SHARED RAIL FACILITIES, R R. Resor and P K. Patel
PLATFORM LAYOUT FOR THE NEW BRITAIN TO HARTFORD BUSWAY, K E. Watkins, T Sorenson, and N Garrick
Submissions from 2001
TRACK DEGRADATION ASSESSMENT USING GAGE RESTRAINT MEASUREMENTS, Roemer M. Alfelor, Gary A. Carr, and Mahmood Fateh
USER BEHAVIOR EVALUATION OF AN INTELLIGENT SHARED ELECTRIC VEHICLE SYSTEM, M Barth and M Todd
Evaluation of the economic viability of narrow-gauge local rail systems, Center for Urban Transportation Research and Florida Department of Transportation
Track-Related Research: Volume 1, D. Davis, S. Kalay, R. Morgan, R. P. Reiff, J. Sun, J. Peters, R. Smith, M. Scholl, and R. Steele
TRAVELLING TO WORK: WILL PEOPLE MOVE OUT OF THEIR CARS, S Kingham, J Dickinson, and S Copsey
COMPATIBILITY AND CONSTRAINTS BETWEEN HIGH-SPEED PASSENGER TRAINS AND TRADITIONAL FREIGHT TRAINS, A Lopez-Pita and F Robuste
RISK AND TRAIN CONTROL: A FRAMEWORK FOR ANALYSIS, C D. Martland, Y Zhu, Y Lahrech, and J M. Sussman
ESTIMATION OF INVESTMENT IN TRACK AND STRUCTURES NEEDED TO HANDLE 129 844-KG (286,000-LB) RAILCARS ON SHORT-LINE RAILROADS, R R. Resor, A M. Zarembski, and P K. Patel
FUNDAMENTAL NONLINEAR TRACK LOAD-DEFLECTION BEHAVIOR FOR CONDITION EVALUATION, T R. Sussmann, W Ebersohn, and E T. Selig
CONCRETE SLAB TRACK STATE OF THE PRACTICE, Shiraz D. Tayabji and David Bilow
Wheel and Rail Vibration Absorber Testing and Demonstration, Transportation Research Board and Wilson, Ihrig and Associates
EVALUATION OF UNIAXIAL STRAIN TRANSDUCER FOR RAILROAD INFRASTRUCTURE, H-B Yun, H Lee, and B Maclean
Submissions from 2000
COMMUTER RAIL, FREIGHT RAILROADS, AND THE OPEN ACCESS DEBATE, J G. Allen
ESTIMATING MAINTENANCE-OF-WAY COSTS FOR U.S. RAILROADS AFTER DEREGULATION, C G. Bereskin
COST COMPARISONS OF REMEDIAL METHODS TO CORRECT TRACK SUBSTRUCTURE INSTABILITY, S Chrismer and D Davis
COST-BENEFIT ANALYSIS OF SLEEPER REPLACEMENT STRATEGIES: SIMULATION MODEL, Maree R. Lake, Luis FERREIRA, and Martin H. Murray
A DETERMINISTIC APPROACH TO EVALUATING TRANSPORT INFRASTRUCTURE AT A TERMINUS, S Powell and H Y. WONG
AUSTRIAN TRACK TESTING AND RECORDING CAR EM 250: SOURCE FOR WHEEL-RAIL INTERACTION ANALYSIS, G PRESLE, W Hanreich, and P Mittermayr
ASPHALT TRACKBED TECHNOLOGY DEVELOPMENT, J G. ROSE, E R. Brown, and M L. Osborne
RAIL TRACK MAINTENANCE PLANNING: AN ASSESSMENT MODEL, Scott A. Simson, Luis Ferreira, and Martin H. Murray
USING THEORETICAL MODELS TO DESIGN LOW-NOISE WHEELS AND TRACK, D J. THOMPSON and CJC JONES
Track Design Handbook for Light Rail Transit, Transportation Research Board and Parsons, Brinckerhoff, Quade and Douglas, Incorporated
Submissions from 1999
MAXIMIZING OPERATING RELIABILITY IN DESIGN OF LONG SINGLE-TRACK LIGHT RAIL TRANSIT LINES, D Dure
ROADWAY WIDENING COSTS FOR GEOMETRIC DESIGN IMPROVEMENTS TO ACCOMMODATE POTENTIAL LARGER TRUCKS, D W. Harwood, W D. Glauz, and Lily Elefteriadou
RESILIENT MODULUS OF SOFT SOIL BENEATH HIGH-SPEED RAIL LINES, M Heelis, A DAWSON, A COLLOP, D Chapman, and V Krylov
SIMPLIFIED TRACK EVALUATION FOR LOW-SPEED, LOW-TRAFFIC RAILROAD LINES, D Plotkin and L Sandhaas
Submissions from 1998
TRACK TIME: CONSTRUCTION OR THE CUSTOMER, J W. Palmer
TORONTO: A HISTORICAL LEADER IN TRANSPORTATION INNOVATIONS, R Stewart and J Musters
Submissions from 1997
PLANNING AUSTRALIAN FREIGHT RAIL OPERATIONS: AN OVERVIEW, Luis FERREIRA
INTEGRATION OF TRANSPORTATION AND LAND USE PLANNING THROUGH RESIDENTIAL STREET DESIGN, J West and A Lowe
Submissions from 1996
OPTIMAL SCHEDULING OF TRAINS ON A SINGLE LINE TRACK, A Higgins, E Kozan, and Luis FERREIRA
Submissions from 1994
A MODEL AND STRATEGY FOR TRAIN PATHING WITH CHOICE OF LINES, PLATFORMS, AND ROUTES, M Carey
EXTENDING A TRAIN PATHING MODEL FROM ONE-WAY TO TWO-WAY TRACK, M Carey
STOCHASTIC APPROXIMATION TO THE EFFECTS OF HEADWAYS ON KNOCK-ON DELAYS OF TRAINS, M Carey and A Kwiecinski
PRICING OF TRACK TIME IN RAILROAD OPERATIONS: AN INTERNAL MARKET APPROACH, P T. Harker and S HONG
Submissions from 1986
UNIQUE ROADWAY DESIGN REDUCES BUS-BIKE CONFLICTS, S Berchem and W O. Somerfeld
APPROACH TO IMPROVING RAILWAY ENGINEERING/MAINTENANCE PRODUCTIVITY, L S. Lawrence and W R. Steinmetz